1Getting started and finding your way
Signing in
- Open the system address in a browser on your computer or phone.
- Enter the email and password your administrator gave you and press Sign in.
- Forgot it? Press Forgot password?, enter your email and use the link you receive to choose a new password.
- If you were given a temporary password, the system asks you to choose your own before you continue.
Language and direction
The language button in the top bar (ع / EN) switches between Arabic and English. In Arabic the whole screen is mirrored right-to-left; numbers and codes (document and material numbers) always stay left-to-right so they never flip.
The menu: icon rail and section panel
On a computer the menu has two tiers on the left of the screen (on the right in the Arabic interface):
- Icon rail — one icon per section: Home, Sales, Payments, Inventory, Procurement, Manufacturing, Delivery & installation, Compliance, Reports, Administration. Hover an icon to see its name. A small dot on an icon marks the section of the page you are on. The circle with your initials at the bottom opens the Account menu: Change password and Sign out.
- Section panel — the chosen section's title and screens. Some screens sit in groups you open and close with +/-, such as Stock & records and Stock operations under Inventory, or Organization and System under Administration. The group holding the current screen opens by itself.
- Search menu — the box at the top of the panel filters the section's screens as you type, ignoring case and accents (it also folds Arabic letter variants). Typing a group name shows all its screens. Esc clears it.
- Collapse menu — the double-chevron button in the panel header hides the panel and keeps only the rail, giving the page more room. Expand menu on the rail, or choosing any section, brings it back. The browser remembers your choice for your account.
You only see the sections and screens your permissions allow, so your menu may differ from a colleague's. The rail also works with the keyboard: arrow keys move between sections, Enter selects.
On a phone
A bottom bar shows Dashboard Scan Approvals Menu. Menu (or ☰ in the top bar) opens a drawer from the side with the rail and the section panel together; close it with ✕, by tapping outside it, or with Esc. On phones the account menu is in the top bar.
The top bar of every screen also holds the global Search (chapter 5), the notification bell and the language button. The Help icon at the bottom of the rail opens this guide.
Scanning with the camera
Home › Scan reads the QR codes and barcodes on materials, areas and job cards and opens the record directly. You can also scan with the phone's own camera: the link opens the system after you sign in.
- Material label → the material card and its balances.
- Area label (e.g. FAC-RAW) → the stock in that area.
- Job card (number starting MJ-) → the job.
- Delivery note (DEL-) → the trip; delivery order number (DO-) → the delivery order.
2Roles and permissions
Each user has one or more roles, sometimes limited to a department. These are the default roles; the administrator can change what any role may do.
| Role | Main work in the system |
|---|---|
| System Administrator | Users, roles, settings, approval workflows, SMS templates and the audit log. |
| General Manager | Sees everything; approves large amounts, overrides the payment gate, closes orders manually; management dashboard. |
| Operations Manager | Approves purchase orders, stock adjustments and stocktakes; adjusts cutting sheets; oversees operations. |
| Sales Manager | All sales screens; approves special discounts and credit requests. |
| Salesperson | Own customers, projects, quotations and sales orders. |
| Finance / Collections | Records, verifies and voids payments; receivables and collection follow-up. |
| Purchasing Officer | Purchase orders and suppliers. |
| Warehouse Manager · Storekeeper | Receiving, transfers, adjustments, stocktakes, labels; loading and dispatching trucks. |
| Factory Manager | All of manufacturing, the production board, production operations and instructions. |
| Foreman | Starts production, updates operations, records consumption and uploads photos from the phone. |
| QC Inspector | Fills in and submits quality checks. |
| Installation Supervisor | Installation jobs, team, progress, snags and customer approval. |
| Delivery Coordinator | Delivery orders and trips, truck booking, delivery outcome and customer feedback. |
| Compliance Officer | Compliance records, renewals and reminders, including confidential records. |
| Management Viewer | Read only; management dashboard and reports. |
Data scope: a salesperson sees only their own customers, all projects of those customers, and the quotations and orders where they are the salesperson. Holders of a "view all" permission see everything. The same scope applies to attachments: nobody can open a file attached to a record they may not see.
In manufacturing a user sees the jobs of the factory divisions he belongs to and the jobs he supervises or created, unless he may view all jobs.
3Concepts used on every screen
Status
Every document has a status (Draft, Confirmed, Completed…). Status only changes through buttons, and you only see the buttons allowed for the current status and your permissions. Every change is kept in the status history with date, user and reason.
Automatic numbering
Document numbers are given on saving, e.g. QUO-2026-00012, SO-…, MJ-…. They are never repeated or changed.
Attachments
The attachments panel on a record (button Attach) takes photos, drawings and contracts (PDF, images, office files). Some attachments are formal evidence and cannot be deleted.
Audit log
Important actions are recorded and cannot be erased: who did what and when, with values before and after.
Reason required
Cancelling, holding, rejecting and releasing reservations ask for a reason, which is shown later in the document's history.
Stock movements
Every quantity change goes through a fixed stock movement that is never edited. Mistakes are corrected with a reversing movement, not by changing the original.
Units: enter quantities in the unit you work with (slab, m², piece…); the system converts them to the material's base unit. Amounts are in Saudi riyals (SAR); VAT is 15% by default.
4Dashboard
Home › Dashboard is the first screen after signing in. It shows figures (tiles), and every figure is a link: select it to open the matching list already filtered (e.g. Overdue jobs opens only the late manufacturing jobs). The list then shows the filter as a chip with Clear this filter.
My work (everyone)
| Tile | Meaning |
|---|---|
| My open tasks | Open and in-progress tasks assigned to you. |
| My overdue tasks · My tasks due today | Of those: past their due date, and due today. |
| Unread notifications | Bell notifications you have not read. |
| Approvals waiting for me | Approval requests waiting for your decision (always shown to managers, to others when something waits). |
Management dashboard
For holders of the management dashboard permission (General Manager and Management Viewer by default). Each section appears only if you may view that area.
| Section | Tiles and what they mean |
|---|---|
| Sales | Open quotations (draft, under review, created), Accepted quotations not yet converted, Sales pipeline (open and accepted together), Active orders, Orders awaiting payment — each with count and amount. |
| Inventory | Total stock (materials in stock, and value if you may see cost), Low stock (at or below reorder level), Slow-moving stock (no outbound movement for 90 days by default), Remnants, Waste this month; plus the list Stock by location. |
| Production | Jobs in production (including rework), Overdue jobs (past the required date, not completed), Jobs awaiting QC, Completed jobs, and this month's On-time completion and First-pass QC yield (both open the production performance report). |
| Delivery | Pending deliveries (delivery orders not yet scheduled), Today's deliveries, Partial deliveries, Failed deliveries awaiting redelivery. |
| Payments | Due today, Due this week (within 7 days), Overdue, total Outstanding balance — all open Receivables. |
| Compliance | Expired, Expiring within 7 days, then 8–14, 15–30 and 31–60 days; each opens the same bucket on the compliance dashboard. Confidential records are counted but stay restricted. |
Role home widgets
Users without the management dashboard see groups that fit their work — several groups if they hold several roles:
Warehouse
Receipts to post, Open transfers, Open stocktakes, Low stock.
My division's jobs
For foremen: the number of their divisions' jobs in each status; each line opens the jobs in that status.
Sales follow-up
My follow-ups due, Quotations expiring in 7 days, Orders awaiting payment.
Deliveries
Today's trips, Failed deliveries.
Installation
Today's installations, Open critical snags.
Compliance
Due within 30 days or expired.
5Global search
The Search box in the top bar searches the whole system: customers, projects, quotations, sales orders, manufacturing jobs, materials, suppliers, delivery orders and trips, installation jobs, payments, reminders, compliance records, tasks and documents.
- Press / or Ctrl K (⌘ K on a Mac) on any screen, or select the search icon. On a phone it opens as a full-screen sheet.
- Type at least 2 characters: a number (SO-2026-000123) or its beginning, or a name in Arabic or English.
- Results appear as you type, grouped by type (five per type). Move with the arrow keys and press Enter to open one, or See all results for the full results page with a type filter.
- Numbers first: type a full document number and that record comes first, marked Exact match.
- Arabic spelling variants: أ/إ/آ/ا, ة/ه and ى/ي are treated alike, vowel marks and tatweel are ignored, Arabic-Indic digits work. "احمد" finds "أحمد", and "نور" finds "مؤسسة النور".
- Every word you type must be the start of a word in the record, so more words narrow the results.
- Restricted records: you only find records you may see. Confidential compliance records (visas, employee documents) may appear to others as a "Restricted record" line without number or link, with the note You are not allowed to open this record.
6Approvals
Some actions need approval before they take effect. Requests reach Home › Approvals for everyone allowed to decide them.
| Action | When approval is needed | Who approves |
|---|---|---|
| Special discount on a quotation | Any line's effective discount above 10% | Sales Manager |
| Credit sale | When credit is requested for a sales order | Sales Manager, then the General Manager if the order reaches SAR 100,000 |
| Payment gate override | When an override is requested | General Manager |
| Purchase order | Every order | Operations Manager, then the General Manager from SAR 50,000 |
| Stock adjustment | Value impact above SAR 1,000 | Operations Manager (Warehouse Manager if there is none) |
| Stocktake | Total variance value above SAR 1,000 | Operations Manager (Warehouse Manager if there is none) |
- Open Approvals and choose a request to see its summary (amount, customer, discount, credit limit and overdue balance…).
- Approve or reject. Rejecting needs a reason, which reaches the requester.
- After the decision the document continues by itself: e.g. a quotation becomes Created after the discount is approved, or goes back to Draft after a rejection.
Who has to approve? While something waits for approval, its page shows a blue note such as Waiting for approval by Sales Manager: Ali Hassan · level 1 of 2 · then General Manager. Purchase orders that need approval list the users who may approve them.
7Customers and projects
Customer
Sales › Customers › New customer. Enter the name, customer type (contractor, project company, individual…) and contact details.
- VAT number is optional: 15 digits starting and ending with 3.
- Commercial registration (CR) is optional: 10 digits.
- Mobile numbers in international format, e.g. +9665XXXXXXXX. You may type 00 instead of +; the system converts it.
- If the VAT, CR or phone already belongs to another customer, the warning Possible duplicate appears. It does not block saving — check before you continue.
Every new customer starts with credit status Cash only. Only holders of the credit-approval permission change the credit status.
The customer page brings together contacts (one primary), projects, quotations, sales orders, payments and the Communications log. Log every important call, visit or message there.
Project
A project groups a customer's work at one site. It shows the Delayed tag when its expected completion date has passed, or when one of its open sales orders is past its required date and not fully delivered. The customer cannot be changed after the project is saved.
Every enquiry starts as a quotation: press New quotation on the customer or project page and the customer (and project) are filled in.
8Quotations
Creating a quotation
- Sales › Quotations › New quotation, or New quotation on a customer or project page. Every enquiry starts here; there is no separate request step.
- Choose the customer, the project and the quotation language: Arabic, English or Bilingual (Arabic + English). The language is taken from the customer’s preferred language when you choose the customer; change it here if needed. A customer who is not in the list yet: press New customer under the list, fill in the name (and phone, VAT number… if known) and Create customer. The project form opens straight away: enter the project name and site, Create project (or Skip). Both are selected on the quotation. If a customer with the same phone or VAT number exists, the system lists it first so you can pick it instead.
- Enter the Delivery lead time (days): how many days after the order the goods will be delivered. It is printed on the quotation and becomes the order's required date when the quotation is converted.
- Add lines: a material from the list or a Free-text line, with quantity, price and line discount. Mark the lines that need fabrication.
- For stone and marble lines enter the size: thickness (mm), width (cm) and length (cm). They are filled in from the material when it has dimensions. On m² lines the number of pieces is calculated: area ÷ (width × length), rounded up. For example, 40 m² of 60×60 cm = 40 ÷ 0.36 = 111.1 → 112 pieces. On other lines (e.g. linear metres) type the number of pieces yourself. The size is mandatory on stone lines (material or fabrication sold by m² or linear metre): a draft can be saved without it, but Create refuses until every such line has thickness, width and length (and pieces on linear-metre lines).
- Use Remarks / special instructions on a line for finish, edge work, cut-outs and similar notes. Remarks print on the quotation and reach the sales order and the factory. For a special design press Attach design files and add photos or drawings: they are internal only (never printed on the quotation) and the factory sees them on the manufacturing job.
- Add a document discount if any (percentage or amount); the system spreads it over the lines in proportion to their value.
- Press Save draft. A draft can be saved before every price is known: leave the unit price empty and come back to it. Send works only when every line has a price.
- If the customer drops the enquiry before it is priced, cancel the quotation with a reason.
Send to customer: on a created or accepted quotation, the Send to customer section sends a contact of the customer (one with a phone number and message consent, added on the customer page) a WhatsApp or SMS message with a private link to the quotation. The link opens the quotation in the company design, ready to print or save as PDF, until its valid-until date. The list shows each link with how many times it was opened; Stop link ends it at once. A revised, cancelled or converted quotation stops its links automatically. While the quotation is created and valid, the customer can also accept it from the link: they type their full name, tick the confirmation and press Accept quotation. The quotation becomes Accepted, the page shows "Accepted by the customer online", and you get a notification in the ERP plus a WhatsApp / SMS message on the phone number in your user profile, with a short link that shows the quotation (view only, no sign-in, works for 30 days). It is listed with the links as "Salesperson · view-only link".
Printed quotation: Print gives an A4 page in the company's style: letterhead and logo, lines, totals before VAT, VAT and total including VAT ("ex-factory" when installation is not included), terms, signatures with the stamp, bank accounts and the branch addresses. On a long quotation the letterhead and the footer repeat on every page. An administrator changes the letterhead texts, signatures, bank accounts and footer under Administration › Settings › Printed documents.
Calculation: the line discount is applied first, then the document discount; VAT is then calculated per line and rounded to the halala. Totals cannot be typed in — the system calculates every figure.
Salesperson: a quotation is recorded under the salesperson who creates it; salespeople do not see the salesperson field. The Sales Manager and the General Manager see it and can hand an open quotation to another salesperson with Assign on the quotation page (recorded in the audit log).
After creating
- Customer accepted or Customer rejected according to the customer's answer. Acceptance is possible only within the validity period and on the latest revision.
- Revise creates a new revision (dated today, with a new validity); the old one is cancelled with the reason "revised".
- Print opens the print page; use the browser's print command or save as PDF.
- A full copy of the quotation at the moment it was created is kept in the audit log.
Automatic expiry: quotations are valid for 30 days by default. Every night at 00:30 a created quotation past its validity becomes Expired and the salesperson is notified.
9Sales orders and the payment gate
From quotation to sales order
- Open the accepted quotation and press Convert to order. Lines, prices, sizes and piece counts are copied unchanged, and the required date is set to the order date plus the quotation's delivery lead time.
- Check the required date (enter it if the quotation had no lead time), the payment terms and the site contact. Line remarks can still be corrected after the order is confirmed; each change is recorded in the audit log.
- Review the installment schedule: Use term default builds it from the payment term (e.g. 50% on order, the rest on delivery), or Add installment by hand. The installments must add up to the order total.
- Press Confirm order.
The payment gate
Manufacturing does not start before the payment condition is met. It is met when any one of these is true:
- Verified payments cover the required down payment.
- The payment term needs no down payment (e.g. "Net 30").
- Credit has been approved for the order.
- A payment gate override has been approved.
On confirmation, an order whose condition is not met becomes Awaiting payment, and moves to Confirmed by itself as soon as a covering payment is verified. Orders without fabrication lines are checked at dispatch instead.
Credit and override
- Request credit sends a credit-sale request with the customer's credit limit, outstanding and overdue balance. Scheduling a smaller down payment than the payment term makes the order a credit sale that needs this approval.
- Request gate override sends a request to the General Manager. Holders of the permission can Override payment gate directly, with a reason.
Editing, holding and cancelling
- After draft, lines and prices cannot be changed; only operational details (Edit details).
- Put on hold needs a reason and notifies the Factory Manager; it does not stop manufacturing jobs automatically. Resume returns the order to its previous status.
- Cancel order needs a reason; after manufacturing started it needs a higher permission. Payment allocations are released and verified amounts stay as customer credit.
- Record invoice stores the invoice number from the external accounting system. A sales order is not a tax invoice.
10Payments
- On the sales order press Record payment, or Payments › Payments › Record payment.
- Enter amount, method (bank transfer, cash, cheque…) and reference, and attach the receipt image.
- Allocate the amount to installments: Allocate earliest due first does it automatically; you can adjust by hand.
- Press Record payment. It stays Pending verification.
- Finance reviews it and presses Verify or Reject with a reason.
Only verified payments count towards the payment gate and installment statuses: Not due, Due soon (within 7 days by default), Due today, Overdue, Partially paid, Paid.
11Receivables and collection follow-up
Payments › Receivables groups outstanding installments into buckets with count and amount; each bucket opens its list:
"High priority" = overdue and marked high priority, or more than 30 days late, or SAR 50,000 or more (configurable). A salesperson sees only his customers; installments on hold are left out of the buckets.
The follow-up page of an installment
- Log follow-up: call, SMS, visit, email or note, with the outcome, promised payment date and next follow-up date. The log cannot be edited or deleted.
- Call and Send SMS: the customer's number with a Call button, and Send SMS with a template and preview. SMS go only to a contact who consented to receive them.
- Put on hold with a reason (stops reminders), then Release hold.
- Escalate now with a note: the next level is notified at once (Sales Manager, then General Manager).
- Responsible and priority: the order's salesperson by default; a Sales Manager or Finance can change it and set the priority.
Automatic payment reminders
| When | To whom | How |
|---|---|---|
| 7 days before, on the due date, the day after, then weekly | The responsible user (salesperson) | In-app |
| 3 days before, on the due date, 3 and 10 days after | The customer | SMS |
| 7 days after the due date | Sales Manager | In-app (first escalation) |
| 30 days after | General Manager | In-app and SMS (second escalation) |
Reminders stop by themselves when the installment is paid or put on hold, or the order is cancelled or closed; the same message is never sent twice.
On the payment itself
- Void payment for a verified payment (e.g. a bounced cheque), with a reason: it stops counting, installments are recalculated, the salesperson is notified, and an order that passed a stage because of it is flagged (its status is not reversed automatically).
- Allocate credit: the unallocated remainder of a verified payment goes to the customer's open installments.
- Print receipt in Arabic or English, for verified payments only; it is not a tax invoice.
The sales order shows a payment summary: order value, required and received down payment, balance, installment dates and statuses, and the next follow-up. The customer page has a tab with the SMS sent to that customer.
12Inventory
Stock is held at locations (warehouse, factory) and each location has areas with a purpose: raw material, WIP, finished, ready for delivery, remnants, waste, damaged, rejected… Only areas that count as available are included in the stock available for sale and reservation.
Materials
Each material card: code, barcode, category, units, stone attributes (type, colour, finish, thickness), balances per area, movements and attachments. Cost is a weighted average updated with each receipt.
Stock
Balances per material and area: quantity, reserved, available. Filter by location, area or material — or scan a label.
Transfers
Move a quantity from one area to another; an out and an in movement at the same cost are recorded together.
Adjustments
Increase, decrease, write-off or supplier return, with a reason. Approval is needed above SAR 1,000 value impact.
Stock movements
Every movement with date, type, user, linked document and cost. For review and audit only.
Remnants and waste register
Remnants are reusable pieces with their dimensions. Waste is recorded by category from production or adjustments.
Opening balances
Loading the counted stock when the system goes live, by importing a CSV or Excel file.
Labels
Print QR and barcode labels for materials and areas to make scanning easy.
Stocktake
- Create a stocktake, set its scope (locations, areas, materials), then Start counting.
- The team counts and enters quantities, usually on the phone.
- Finish counting shows the variances between counted and expected, with their value.
- Submit for approval, then Approve and post to record the variances as stock movements.
Every night the system checks that balances match the movements and reports any mismatch, and each morning it sends a digest of materials that fell below their reorder level.
13Purchasing and receiving
There is no separate purchase request: anyone who needs something bought tells the Purchasing Officer, who creates the purchase order directly. All purchases are in SAR.
Purchase order
- Procurement › Purchase orders › New: choose the supplier, add materials or free-text lines with quantity and unit price (each line shows its amount and the totals update as you type), then Save draft.
- Send for approval: the Operations Manager approves every order, and the General Manager too when the total before VAT reaches SAR 50,000. The page shows who has to approve; once approved the order is issued automatically and can be printed and sent to the supplier.
- If an approver rejects it, the order returns to Draft with the reason: correct it and send it again. Cancelling an order that waits for approval withdraws the approval too.
- You cannot receive more than the quantity ordered.
- Close order ends the order even if not everything was received. Cancel order is possible only before any receipt.
Receiving and incoming inspection
- On the purchase order press Receive goods, or go to Inventory › Stock operations › Receiving.
- Enter received quantities, the put-away area and the batch/block number, and attach photos of the goods.
- Record the inspection per line: accepted and rejected quantities. Rejected stock goes to the Rejected area and is never available.
- Save & post puts the accepted quantities into stock and updates the average cost.
A mistake on a posted receipt? It cannot be edited: press Correct then Create correction receipt to reverse the quantity at the original receiving cost.
14Manufacturing jobs
Side statuses: On hold, Rework (after QC), Rejected, Cancelled.
Two kinds of job
Make to order
Linked to a sales order. Created from the order, its materials and outputs are filled in from the fabrication lines. The finished product is reserved for the order line until delivery.
Make to stock
No customer. The finished product goes into stock available for sale, and the job ends at Completed.
Creating a job
- Manufacturing › Manufacturing jobs › New job, or from the sales order.
- Header: factory division, priority, foreman, machines, and the two mandatory dates: Planned start date and Required delivery date (on or after the start). The job card appears on the board and the foreman's screen a few days before the start (setting Show jobs before their start, default 3 days) and stays until the job is finished.
- Materials (Material): material, issue area, planned quantity.
- Outputs (Output): description, material, quantity and put-away area (a finished-goods area), plus the cutting sheet: thickness (mm), width and length (cm) and the number of pieces. From a sales order they are copied from the sales line. On m² lines the pieces are calculated (area ÷ width × length, rounded up); on other lines type them.
- Operations (Add operation): cutting, CNC, waterjet, polishing… in sequence, with workers.
- Instructions: choose the job-card languages (Arabic, English, Urdu, Hindi, Bengali), then Add from library so the phrase appears in every language, or Write instruction for free text. An Untranslated badge marks a missing language.
- Save job.
Cutting sheet and daily progress
- Adjusting the cutting sheet: the Operations Manager and the Factory Manager can change the size and pieces of an output line with Adjust on the job page at any time until the job is finished, also after approval. Each change is recorded.
- Daily progress: the foreman records every day the pieces done on each task (cutting, CNC, polishing…), with an optional note. The job page and the foreman screen show each task against the pieces of the cutting sheet, e.g. Cutting 80 / 112 pcs · 71%. Starting to record on a task marks it in progress.
- Corrections: an entry is never edited, not even the same day. Press Correct on the entry and enter the difference (negative to reduce, e.g. −5) with a reason. A task's total cannot go below zero.
- Missing size: if an output line has no cutting size, the job page shows a warning with the line numbers. It does not stop approval or production.
- Not started on time: a job past its planned start that has not started production shows this tag on the board, the foreman screen and the job list (with a filter).
Stages and their buttons
| Button | What happens | Conditions |
|---|---|---|
| Approve | The job becomes Approved and the sales order In production. | At least one material and one output; confirmed sales order; payment gate met. |
| Reserve material | All materials are reserved in their areas. | All or nothing: if one material is short nothing is reserved and the short material is shown. |
| Release reservation | Materials become available again; the job returns to Approved for editing. | Before issue, with a reason. |
| Issue to WIP | Reserved materials move to the WIP area. | — |
| Start production | The actual start time is recorded. | Payment gate if its stage is "production start". |
| Supplementary issue | Extra material when more is consumed. | During production, with a reason. |
| Post and send to QC | Consumption, waste, remnants and returns are posted and a quality check is opened. | See the rule below. |
| Mark ready for delivery | The salesperson is told the order is ready. | Make to order, output in a dispatchable area. |
| Put on hold / Resume | The job pauses with its reservation kept, then returns to its previous status. | Reason for the hold. |
| Cancel job | Reservations are released. | Before issue only; afterwards return the material first. |
Recording consumption
When production is finished (Move to QC…), enter for each material:
- Actual use: everything used, including waste and remnants.
- Waste with its category, and remnants with their dimensions (e.g. 60×40).
- Returned: what was not used and goes back to the issue area.
Finished-product cost = total cost of net consumption ÷ quantity produced, including every rework round.
Job card
Print job card prints an A4 sheet with the job's QR code, customer, division and dates, a materials table with blank columns for handwriting, the operations list for signatures, the instructions in every chosen language with its own script and direction, and the attached drawings. Prices never appear on the card.
15Production board and foreman screen
Production board
Manufacturing › Production board has three views:
- Board: columns Ready for production, In production, Quality check, Rework, Completed. Cards show customer, division, required date, priority and an Overdue tag. From the board you can only Start production and Resume production after rework, by dragging or with the button; other moves open the job. Completed jobs stay 14 days.
- Calendar: each job from its planned start to its required delivery date (start marker, a bar on the days between, delivery flag); a list on phones.
- Workload: open jobs per division and operation, with late jobs and those due in the next 7 days.
My jobs (the foreman's phone screen)
- Open Manufacturing › My jobs, or scan the QR on the job card.
- Press Start production when work really starts.
- Every day, record the pieces done per task under Daily progress (Record pieces). To fix a mistake use Correct — entries are never edited.
- Update each operation: Start / Done.
- Photograph the work and upload the photos to the attachments.
- When finished, Record use and send to QC.
Choose the language of the instructions on the same screen; the system remembers it for the session.
Gangsaw
- Blocks are registered first. The Operations Manager gives each block a serial number while it is unloaded; the Warehouse Manager registers it under Inventory › Blocks with its number, supplier and material, e.g. Qassim Stone – Block (Register block). A block can be corrected while it is still available.
- Manufacturing › Gangsaw › Load gangsaw: enter the slab thickness (mm), and for each of one or two blocks pick the section it is taken from, then the material, then the block number (only blocks registered under that material are listed), and measure length, width and height in cm. The system shows each block's m³.
- Start the saw: the blocks leave stock and are shown "On the saw" in the block register too.
- When the saw is done, open the run and for each block choose the slab stock item (e.g. "Carrara slab 20 mm", counted in m²) and where to store it, then enter the number of slabs and their estimated length × width, with remarks. The total m² and the waste % appear as you type.
- Record slabs: the slabs enter stock in m² at the cost of the block.
The factory's stones: Nassah White, Grey, Hota Yellow and Qassim stone. Each has a block material (pieces, e.g. Qassim Stone – Block) and slab materials of 20 mm and 30 mm (m², e.g. Qassim Stone – Slab 30 mm). New stones are added under Administration › Inventory lists › Stone types, then a block and slab materials are created for them.
Waste = 1 − (slab m² × thickness) ÷ block m³. Example: block 180 × 160 × 120 cm = 3.456 m³; 72 slabs of 180 × 120 cm at 20 mm = 155.52 m² = 3.11 m³ → waste 10%. Above the standard (setting, default 10%) it shows in red, otherwise green. Recorded slabs can still be corrected: Correct on the block, change the number, size or remarks and give the reason. Stock and waste follow automatically, and each correction is listed on the run. A run can be cancelled with a reason before the slabs are recorded; the blocks go back to stock and are available again. After the slabs are recorded each block shows "Cut into slabs" with its run.
16Quality control
Manufacturing › Quality control lists all checks: incoming (from receiving), manufacturing and pre-delivery. A new manufacturing check opens automatically when a job is sent to QC.
Inspector
- Open the check and answer every checklist item (conforming / not conforming / not applicable) with a remark. Mandatory items must be answered.
- Upload photos of defects.
- Choose the result: Passed, Passed with remarks, Rework required, Failed. Defects must be described for anything other than Passed.
- Submit inspection.
Approver
A holder of QC approval reviews the submitted check, confirms the quantity produced for each output, then:
- Approve and complete the job: the finished product enters stock at the calculated cost and the job becomes Completed.
- Approve and send to rework: the job becomes Rework and the rework counter goes up. After the fix the foreman resumes production, records the new consumption (even zero) and a new check opens.
- Approve and reject the job: with a reason; nothing enters stock.
17Delivery
Delivery has two levels: the delivery order says what is delivered from the sales order and from which area; a trip is one truck carrying part or all of it. A sales order can have several delivery orders, and a delivery order several trips.
Creating a delivery order
- On the sales order press Create delivery order, or use Delivery & installation › Delivery orders.
- For each line enter the quantity and the loading area. Only dispatchable areas are offered; the system suggests the area where the line's manufactured product is reserved, or the one with the most stock.
- Check the site address and contact (filled in from the project and sales order) and the planned date, then save.
A trip step by step
- Plan a trip on the delivery order with the quantities to load, then Create trip.
- Book the truck: date and time, driver name, driver mobile in international format, truck plate and transport company. There is no truck or driver register; details are entered per trip.
- Start loading, then Confirm loaded and dispatch, correcting the loaded quantity if it differs. On dispatch the quantities leave stock exactly once. Print the Delivery note (Arabic or English) for the driver; it has a QR code and a space for the customer's signature, and is not a tax invoice.
- The outcome on site, usually from a phone:
- Confirm delivered: receiver's name is mandatory, with an on-screen signature or a photo of the signed note, and optional photos.
- Confirm partial delivery: enter the delivered quantity per line; the rest counts as returned and goes back to the loading area at the same cost. The delivery order stays open for the remainder and a new trip is planned.
- Report failed delivery: choose the reason and enter notes and the follow-up action. Some reasons (e.g. "site not ready") need a photo first. Everything returns to stock and a follow-up task is created for the salesperson, due the next working day.
- After delivery you can Add feedback: a 1–5 rating, comments and issues.
When every line of the sales order has been delivered the order becomes Delivered, and installments tied to "on delivery completion" get their due date automatically.
Payment gate at dispatch
If the gate stage is "dispatch", or the order has no fabrication lines, the truck cannot leave until the down payment is covered.
Pre-delivery QC
Optional (settings). When on, dispatch is refused until a pre-delivery quality check of the delivery order has passed; start it from the delivery order.
Cancelling
Cancel trip with a reason while it is Planned or Scheduled; after loading starts it cannot be cancelled. A delivery order can be cancelled if it has no trips in progress or finished.
Today's deliveries
A phone screen with today's trips and trips not yet closed, with the site contact's number. Scanning the delivery note QR opens the trip.
Storekeepers see every trip so they can load and dispatch, but they do not record the outcome on site — that is the Delivery Coordinator's job.
18Installation and customer approval
For orders that include installation. A sales order can have several installation jobs, and the order is not complete until the customer approves all of them.
Creating an installation job
- On the sales order press Create installation job, or go to Delivery & installation › Installation jobs and choose the sales order.
- Set the date and team leader (both mandatory) and Add team member: system users or named workers with their roles. You can link a delivery order.
- Write the site requirements and save. The team leader is notified, and again when the date or leader changes (Reschedule / team).
On site
- Start work, then record progress 0–100 with a note (Save progress) and upload photos from the phone. My installations shows today's and upcoming jobs to the leader and team members.
- Put on hold with a reason, then Resume to the previous status; Cancel job with a reason.
- Snags: Add snag with description, severity (Minor, Major, Critical) and photo. A snag is Resolved, Waived with a written reason, or Reopened. The Snags list collects the open ones.
- Work finished: the job becomes Awaiting customer approval and progress 100%.
Customer approval
- Choose Record approval, Record approval with snags or Record rejection.
- Enter the customer's name, position and date, and capture the signature on screen or photograph the signed paper. Signature or photo is mandatory and is kept as evidence that cannot be deleted.
- A rejection needs comments; the job goes back to In progress for rework and a new approval is requested.
Orders without installation
The customer's confirmation at the last delivery is the approval: in the delivery outcome form choose accepted or not accepted, with comments. If not accepted, a task is created for the salesperson and the order stays Awaiting customer approval; when the customer accepts later, use Record decision on the trip.
Automatic order completion
- After full delivery the order moves to Installing if it includes installation, otherwise to Awaiting customer approval.
- When all installation jobs are approved, installments "on installation approval" become due.
- After customer approval the order is Completed if fully paid (verified payments), otherwise Awaiting final payment until the last payment is verified. The system also re-checks every night.
- Manual close: the General Manager can close an order that is awaiting customer approval or final payment (Close order manually) with a written reason (e.g. writing off a small balance); the reason and balance are audited.
The sales order shows a timeline of the order's stages: payment → manufacturing → delivery → installation → customer approval → final payment, with quantities per line and the remaining balance.
19Compliance and renewals
Compliance tracks everything with an expiry date: licences, visas, permits, certificates, insurance, contracts, equipment inspections, subscriptions, government requirements, employee documents and others.
Registering a record
Type, title, reference number, issuing authority, holder (e.g. the employee's name), issue and expiry dates, responsible user and manager, and documents. The expiry cannot be before the issue date. The record gets a CMP- number and its reminders are created automatically.
| When | Notification |
|---|---|
| 60 and 30 days before | In-app to the responsible user and the manager |
| 14 and 7 days before | Escalation: in-app to responsible and manager, and SMS to the manager and the escalation managers set in settings |
| On the expiry date | In-app to responsible and manager |
| After expiry | The record becomes Expired and the reminder repeats weekly until renewed or cancelled |
Compliance dashboard
Each record appears in one bucket according to the days left, with filters by type and responsible user. Select a record to open it.
Renewal
- Start renewal sets the record to Renewal in progress; reminders continue.
- When done, Record renewal with the new expiry date (after the old one), the cost and documents.
- The record is active again with the new date, reminders move to the new cycle, and the renewal is kept in the renewal history with its documents.
Retention review: when an employee's account is deactivated, their records are flagged for review after two years (configurable) in Retention review. The system never deletes anything automatically.
20Notifications, reminders and SMS
The bell
The bell in the top bar shows the number of unread notifications and opens the latest ones with a link to each; you can Mark as read or Mark all as read. View all notifications shows the full history.
Reminder centre
Compliance › Reminders collects all reminders (payments, compliance, customer calls, supplier follow-ups, internal tasks…) with filters by type, status, responsible user and due date.
- Complete a reminder, or Skip it with a mandatory note. A recurring reminder (weekly, monthly, yearly) creates its next occurrence automatically.
- Manual reminder: e.g. "call the customer on Sunday", with a title, date, responsible user and recurrence.
- Each type has default notification points that the administrator edits in Administration › Reminder rules; the points of a single reminder can also be customised.
SMS
- Customer SMS go in the customer's language (or Arabic if no text exists in it), are never sent between 21:00 and 09:00 but held until the morning, and are cancelled if more than 24 hours late.
- Temporary failures are retried after 5, 15 and 60 minutes; permanent failures (e.g. an invalid number) are not retried.
- If the SMS balance runs out the channel pauses and the system administrator is alerted; they resume it after topping up.
- Customer "order ready", "delivery scheduled" and "installation completed" messages are off by default and are switched on in settings once their wording is approved.
SMS templates
Each template's text in Arabic and English with its allowed variables such as {customer_name}, and a preview showing characters and number of SMS segments. Variables that are not allowed are refused.
SMS provider
Administration › SMS provider (System Administrator only): choose the provider and enter the Twilio Account SID, auth token, SMS sender and WhatsApp sender, and whether messages go as SMS or WhatsApp. The token is stored encrypted and never shown again; leave it empty to keep it. Use Send test to check: on a Twilio trial account only phone numbers verified in the Twilio console receive messages, and for WhatsApp Sandbox the phone must first send the join code to the sandbox number. The provider can also be Zaajil (WhatsApp), the company’s own WhatsApp gateway: enter its address, the session ID and the API key from the Zaajil dashboard. Messages go as WhatsApp text from the number linked in Zaajil, with no templates needed. Use a separate WhatsApp number, and an https address.
SMS log
Every send attempt with status and provider response. The Failures tab lists failed messages with Re-queue (optionally with a corrected number), and the channel status with Resume SMS.
21Tasks
Home › My tasks lists open and in-progress tasks assigned to you, with overdue ones highlighted. Managers also see a Team tasks tab for colleagues in their department.
- Tasks are created automatically (e.g. a failed delivery) or by hand with Add task on any record you may see, or New task in My tasks.
- Each task has a number, responsible user, due date, priority and a link to the source record. The assignee is notified.
- Only the assignee, or a manager who may view all in the module, changes a task. You can add a note with each status change and reassign it to a colleague.
22Reports
Reports › Reports is the catalogue of every report you may run, by area, each with a one-line description. You only see the areas you have report permissions for.
| Area | Reports |
|---|---|
| Inventory | Stock by material, location and area · Stock movements · Stock adjustments · Stocktake variances · Low stock · Slow-moving stock · Remnants · Waste |
| Purchasing | Purchases by supplier · Purchases by category · Receiving |
| Manufacturing | Production jobs by division and status · Production duration · Late jobs · Material consumption · Rework and QC performance · Production performance |
| Sales | Quotations · Sales orders · Customer sales · Project sales · Outstanding orders |
| Payments | Outstanding and overdue balances (ageing 0–30, 31–60, 61–90, over 90 days) · Payment follow-up history · Collection history |
| Delivery | Delivery history · Failed deliveries · Partial deliveries · Delivery performance |
| Compliance | Upcoming renewals · Expired items · Renewal history · Items by responsible employee |
Running a report
- Choose the report in the catalogue.
- Set the filters: the period (From / To) or a date (As of), location, area, material, supplier, division, customer, salesperson… and Show by to group the results (e.g. by material or by location). Results update as you change them.
- Below the table: the row count, totals, and sometimes a note explaining the calculation. Reset filters restores the defaults; All reports returns to the catalogue.
Filtering happens on the server and only over records you may see (a salesperson sees his own customers). Values and costs appear only to users allowed to see cost; confidential compliance records are masked.
Export and print
- Export CSV and Export Excel: the file contains exactly the filtered rows. Exporting needs the module's export permission as well as the report permission, and every export is audited.
- Background exports: above 5,000 rows (configurable) a message says the file is being prepared in the background. A few minutes later a bell notification brings the download link. The link works only for you and only for 7 days; after that the file is deleted — export again if you need it.
- Print opens a clean A4 page with the filters, generation time and your name; print it or save as PDF from the browser. Only the first 5,000 rows are printed (totals cover all rows); use export for the full list.
Production performance
Reports › Production performance, by division, operation or month, filtered by period and job type, with CSV export.
| Measure | How it is calculated |
|---|---|
| Jobs completed | Jobs completed during the period. |
| On-time rate | Completed on or before the required date (jobs without a required date are not counted). |
| Average duration | From actual start to completion, in days. |
| First-pass QC yield | Share of jobs that passed their first quality check. |
| Waste % | Waste ÷ actual use. |
| Material variance | Actual use − planned. |
| Consumption value | Cost of net consumption. |
Delivery performance
Reports › Delivery performance, by month, customer or transport company: number of trips, full, partial and failed rates with failure reasons, on-time rate (trip completed on or before the delivery order's planned date), average customer rating, and the feedback that reported issues. CSV export available.
23Administration and settings
Users and roles
Create and deactivate accounts, assign roles (with a department where needed), unlock accounts, issue temporary passwords, and edit each role's permissions.
Organization
Departments, factory divisions and their operations, locations and areas with their purpose (available? dispatchable?).
Materials setup
Categories, units of measure and conversions, material attributes, inventory lists (adjustment reasons, waste categories, finishes).
Operations setup
Production operations linked to divisions, the instruction phrase library in every language with a "missing only" filter, QC checklists and their items.
Delivery failure reasons
The list of reasons and which ones need a photo. A reason used on a trip cannot be deleted but can be deactivated.
Reminder rules and SMS
Default notification points per type, SMS templates, and the SMS log with its failures.
Approval workflows
Approval levels, amount thresholds and backups per action. Changes affect new requests only.
Audit log
Search every recorded action by user, module and date; export CSV.
Key settings
| Setting | Default |
|---|---|
| VAT rate | 15% |
| Quotation validity | 30 days |
| Payment gate stage | Job approval |
| Due soon | 7 days |
| Allow negative stock | Off |
| Require pre-delivery QC | Off |
| Quiet hours for customer SMS | 21:00 – 09:00 |
| SMS send attempts | 3 (after 5, 15 and 60 minutes) |
| High-priority overdue | After 30 days or from SAR 50,000 |
| Compliance escalation managers | None |
| Employee document retention | 2 years |
| Idle timeout | 120 minutes |
| Slow-moving after | 90 days without outbound movement |
| Rows exported immediately (more go to the background) | 5,000 rows |
Every settings change is audited.
24FAQ and troubleshooting
I can't see the screen or button I need
Buttons depend on the document's status and your permissions. Check the status first (e.g. a manufacturing job can only be approved while it is a draft). If it should be there, ask the administrator to review your role.
"You do not have access to this page" appears when opening a link
The record is outside your scope (e.g. another salesperson's customer). Ask a manager to reassign it to you or to grant view permission.
Nothing was reserved
Reservation is all or nothing. The message names the short material and what is available. Transfer from another area, ask the Purchasing Officer to order it, or change the quantity after releasing the reservation.
"Actual use plus returned quantity must equal the issued quantity"
Check the figures. If you used more than was issued, do a supplementary issue first.
The sales order is stuck in "Awaiting payment"
No verified payment covers the down payment yet. Make sure Finance has verified the payment, or request credit or an override.
The truck cannot be dispatched
The message gives the reason: payment gate not met, pre-delivery QC required and not passed, or the loading area holds less than the loaded quantity.
I made a mistake on a posted document
Posted documents cannot be edited. Use a correction receipt or an adjustment with a clear reason.
Export is refused or does not arrive
Exporting needs the module's export permission as well as the report permission — ask the administrator, or use Print. If the background message appeared, wait for the bell notification (usually a few minutes).
Global search does not find a record I know exists
Type the beginning of a word or number, and check the record is within your scope. New records normally appear at once; otherwise the index is rebuilt every night, or tell the administrator.
Dashboard figures differ from the list
Figures are kept for five minutes. Press Refresh to recalculate.
What is not live yet?
Real SMS start once the SMS provider account is active and the wording is approved later. Until then messages are recorded in the SMS log without being sent.